Ley de Gestión Integral de Residuos
Sets integrated waste management policy, prioritises recovery and dump closure, and establishes the extended producer responsibility regime (art. 38).
View regulation · pixilegal.comAndean countries
Bolivia generates about 8,285 t/day of municipal waste (projected 10,351 t/day by 2030), and 287 municipalities (84.3%) dispose of it in open dumps; only 42 have a sanitary landfill. End-of-life tire generation rose from about 2.95 million units in 2016 to 3.84 million in 2021, with no regular management systems in the capital cities. Agricultural residue figures: not verified.
Regulatory framework
Sets integrated waste management policy, prioritises recovery and dump closure, and establishes the extended producer responsibility regime (art. 38).
View regulation · pixilegal.comRequires producers and distributors to set up individual or collective management systems; EPR initially covers PET bottles, polyethylene bags, tires, batteries, pesticide containers and WEEE, but targets depend on a gradual strategy not yet in force.
View regulation · helvetas.orgEnvironmental licensing and air-emission control framework applicable to thermal treatment plants.
View regulation · lexivox.orgAfter the constitutional ruling that struck down the ban on commodifying environmental functions (art. 32.5 of Law 300), Bolivia created the RENAPP registry, Emission Reduction Units and a credit-trading regulation run by the Ministry of Economy.
View regulation · ferrere.comContext
Incentives
New carbon-credit framework (Supreme Decree 5264/2024, Ministerial Resolution 076/2025) with the RENAPP registry, where the State (Ministry of Economy) has exclusive authority to trade credits. Tax incentives for renewables or environmental equipment and free zones: not verified.
Recommended solution
Sources consulted
Reference information compiled from public sources as of October 2026. It is not legal advice; confirm each regulation is current before making decisions.
Verification level: Medium
Projects and proposals
With the material type, available volume and location we prepare a preliminary technical assessment and the plant scope.